Advertisements


Advertisements

Home » News » Global News » Ceremonial Inauguration at Pobeda LSR in St. Petersburg

Ceremonial Inauguration at Pobeda LSR in St. Petersburg

On 12.12.2012 OAO Popeda LSR, a member of the LSR Group in St. Petersburg, celebrated the start-up of a new backing brick plant.

At the symbolic touch of a button in the robotic unloading installation Aleksej Gavrilov, Director of Pobeda LSR, put the plant into operation. In the presence of the plant management board as well as local officials and press representatives, the plant was handed over to the operators by Andreas Lingl, Managing Director of Hans Lingl GmbH & Co. KG/DE, and the LINGL Russia project team. During the following tour through the plant the visitors could convince themselves of the scope and the cap-ability of this new brick factory which allows for the very flexible production of various types of wall bricks within the range of 2 NF (German standard brick equivalent) up to pored large-size blocks of 14,3 NF meeting the latest product quality requirements according to European standards. At a later date the plant shall be equipped with the modular LINGL grinding centre Turbo 2. In addition to the supply of various individual machines this plant is the second complete brick factory built by LINGL for Pobeda LSR. (12/2012)


Related Supplier

No items found

To be seen in

No items found